Operation Flush: Modernizing Ondo’s Waterways
-
Client
Ondo State Government (OSOPADEC)
-
Category
Marine Engineering & Capital Dredging
-
Project Value
-
-
Date
2024 – 2026
Project 1: Igbokoda – Idi Ogba Alagbon Dredging
This project is a flagship maritime intervention aimed at reconnecting isolated coastal communities and facilitating the movement of goods and people.
Client: Ondo State Government (executed via OSOPADEC – Ondo State Oil Producing Areas Development Commission).
Category: Marine Engineering & Capital Dredging.
Date: 2024 – 2026 (While dredging in this corridor has seen previous phases, the current intensive reclamation and “Safe Waterways” push was revitalized in late 2024).
Project 2: Operation Flush (Waterways Management)
Operation Flush is the state’s rapid-response sanitation and clearing initiative specifically for the riverine areas to prevent flooding and ensure navigability.
Client: Ondo State Ministry of Transport.
Category: Ecosystem Restoration & Waterway Channelization.
Date: 2024 – 2026 (Officially flagged off as a sustained exercise under the “OUR EASE” policy in March 2026).
